Modular, prefabricated steel-framed buildings (roof and exterior walls in sheet metal or sandwich panel). Fabrication time of between 1 and 2 weeks (while the site is levelled and prepared) and building assembly in as little as 3 days, depending on dimensions. Modular and prefabricated design allows rapid erection to meet urgent requirements. Buildings 100% demountable and relocatable.