Assembly process
1. Fully finished modules are loaded onto the lorry or container.
2. Once the lorry reaches the location where the PLENAVE® is to be installed, the modules are unfolded using a crane.
3. If the client selects another location, the modules are folded and placed back on the lorry to be taken to this new location.